This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Terms of Use.
Accept
IndiaPost LiveIndiaPost LiveIndiaPost Live
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
Notification Show More
Font ResizerAa
IndiaPost LiveIndiaPost Live
Font ResizerAa
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
  • India News
  • State
  • World
  • Entertainment
  • Business
  • Trending
  • Sports
  • Career
  • Lifestyle
  • Languages
Follow US
© 2024 NM Media. All Rights Reserved.

News » India News » Varanasi-Kolkata Expressway to reduce travel time between UP and Bengal to six hours once completed

India News

Varanasi-Kolkata Expressway to reduce travel time between UP and Bengal to six hours once completed

NM Desk
Last updated: 11 February, 2025 3:51 PM
NM Desk
Share
Varanasi-Kolkata Expressway to reduce travel time between UP and Bengal to six hours once completed
Varanasi-Kolkata Expressway to reduce travel time between UP and Bengal to six hours once completed

New Delhi: The road journey between Uttar Pradesh and West Bengal is soon going to be completed in just six hours instead of the 12-14 hours taken currently. Commuters travelling from Varanasi to Kolkata by road are soon going to have a smooth ride after construction for 710-kilometre six-lane Varanasi-Kolkata Expressway is completed.

Contents
The expressway includes a 27 km-long highway from Varanasi to ChandauliVaranasi-Kolkata Expressway likely to be completed by next year

The project is being built at the cost of Rs 35,000 crore. While the foundation stone for Ranchi Kolkata Expressway was laid on February 23, 2024, this new route will also connect Kolkata with Varanasi, apart from the Grant Trunk road. This expressway will also connect Ranchi and other important cities. Also, those traveling from Gorakhpur, Mau, Azamgarh, Ballia, Jaunpur, Prayag, Ghazipur, Lucknow, and Delhi will be able to reach Bihar, Jharkhand, Bengal via Chandauli

The expressway includes a 27 km-long highway from Varanasi to Chandauli

According to SK Arya, a senior official with the National Highway Authority of India (NHAI), the greenfield project also includes the 27-kilometre-long highway from Varanasi to Chandauli, work of which has already started. He added that the new expressway will also provide an alternative route for the commuters.

Read More

Nitish Kumar govt metamorphosed capital roads
Bihar to resume disaster safety training in schools with ‘Surakshit Shanivar’ sessions
Is Munna Bhai returning? Director Rajkumar Hirani considering reboot with Sanjay Dutt
Is Munna Bhai returning? Director Rajkumar Hirani considering reboot with Sanjay Dutt
‘Gaddar’ Row: Kunal Kamra granted transit anticipatory bail by Madras high court
‘Gaddar’ Row: Kunal Kamra granted transit anticipatory bail by Madras high court

Notably, once the expressway comes into being, it will not only reduce the travel hours of commuters but will also help in the economy of the region. Vehicles carrying vegetables and other items will be able to reach their destinations quicker than before.

Varanasi-Kolkata Expressway likely to be completed by next year

Once completed, the expressway will meet NH-16 near Uluberia in the Howrah district of West Bengal. At the moment, most of the traffic moves through NH-19. The expressway is expected to be completed by next year. The committee led by the Union Road Transport and Highways secretary finalised the proposed expressway in 2021. Notably, Expressways are the highest class of roads across the country. By December last year, India had a total length of 6,059 km of expressways across the country.

You Might Also Like

US declares Pakistan-backed TRF a global terrorist group after Pahalgam terror attack

Natural disasters claim 3,080 lives in 2024–25 — Highest in 11 years, up 18%

Govt initiates study to trace South Asia’s population history with modern genomics

Uttarakhand: Dhami government sealed 11 madrasas in Dehradun, Muslim organizations protest

Domestic manufacturers raise concerns on imports of refurbished medical devices

TAGGED:BiharDelhi-Kolkata ExpresswayEconomic Impactexpressway constructionJharkhandNH16NH19Road TripSix-lane highwayTravel Time ReductionVaranasi-Kolkata Expresswaywest bengal
Share This Article
Facebook Twitter Whatsapp Whatsapp Telegram Copy Link

Latest News

image editor output image812472244 1770024678844
Singer Jasmeen Akhtar drops her latest single Malak Dyaal
Entertainment
IMG 20260202 WA0000
Indie Artist Prabhanjan Unveils First Look of His Upcoming Afro-Desi Single ‘Thugwa’
Entertainment
indiapost live
They have history and history of overlooking that as well: Jaishankar on Pak-US ties
India News
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
India News

You also Like

RG Kar case: Third edition of ‘Reclaim the Night’ campaign on September 8 midnight
India News

RG Kar case: Third edition of ‘Reclaim the Night’ campaign on September 8 midnight

NM Desk NM Desk 3 Min Read
Bengaluru shocker: Rapido driver slaps woman after she objects to rash driving, video surfaces
India News

Bengaluru shocker: Rapido driver slaps woman after she objects to rash driving, video surfaces

NM Desk NM Desk 3 Min Read
Jalgaon train tragedy: Death toll rises to 13; Railways announces Rs 1.5L ex-gratia
India News

Jalgaon train tragedy: Death toll rises to 13; Railways announces Rs 1.5L ex-gratia

NM Desk NM Desk 5 Min Read
IndiaPost LiveIndiaPost Live
Follow US
© 2024 NM Media. All Rights Reserved.
  • About Us
  • Privacy Policy
  • Contact Us
Welcome Back!

Sign in to your account