This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Terms of Use.
Accept
IndiaPost LiveIndiaPost LiveIndiaPost Live
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
Notification Show More
Font ResizerAa
IndiaPost LiveIndiaPost Live
Font ResizerAa
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
  • India News
  • State
  • World
  • Entertainment
  • Business
  • Trending
  • Sports
  • Career
  • Lifestyle
  • Languages
Follow US
© 2024 NM Media. All Rights Reserved.

News » India News » Mumbai-Ahmedabad bullet train: Union Minister Ashwini Vaishnaw announces completion of 300-km viaduct

India News

Mumbai-Ahmedabad bullet train: Union Minister Ashwini Vaishnaw announces completion of 300-km viaduct

NM Desk
Last updated: 20 May, 2025 4:22 PM
NM Desk
Share
Mumbai-Ahmedabad bullet train: Union Minister Ashwini Vaishnaw announces completion of 300-km viaduct
Mumbai-Ahmedabad bullet train: Union Minister Ashwini Vaishnaw announces completion of 300-km viaduct

New Delhi: Union Railway Minister Ashwini Vaishaw on Tuesday announced the completion of the 300-km viaduct for the Mumbai-Ahmedabad bullet train project. Taking to his social media platform X, the Minister shared a video of the construction of the structure through the Full Span Launching Method (FSLM).

Out of the 300 km structure, 257.4 km has been constructed with FSLM, which was the major reason for the fastening of the work. According to the NHSRCL, 14 river bridges (37.8km) through Span by Span (SBS), 0.9km of steel bridges (10 spans ranging from 60 to 130 m in 7 bridges), 1.2 km PSC bridges (20 spans ranging between 40 and 80 metres in 5 bridges) and 2.7 km in station building were build through FSLM.

300 km viaduct completed.
— Bullet Train Project pic.twitter.com/dPP25lU2Gy

— Ashwini Vaishnaw (@AshwiniVaishnaw) May 20, 2025

The agency said that the 383km of pier work, 401km of foundation and 326 km of grider casting has also been completed for the bullet project.

Read More

Heavy snowfall alert issued for HP, Uttarakhand; check state-wise weather forecast
Heavy snowfall alert issued for HP, Uttarakhand; check state-wise weather forecast
Nitish Kumar govt metamorphosed capital roads
Bihar to resume disaster safety training in schools with ‘Surakshit Shanivar’ sessions
Choti Diwali School Holiday: Schools to be closed in these states today
Choti Diwali School Holiday: Schools to be closed in these states today

https://static.news9live.com/wp-content/uploads/2025/05/BT-video-2-1.mp4

 

The materials used in this project such as launching gantries, bridge grantries, and  grider transporters were all made in India itself. The completion has been achieved after successfully launching a 40 meter long box girder near Surat in Gujarat.

With the full-span technology, the construction speed has increased by 10 times. Each span girder weighs about 970 tonnes. Additionally, more than 3 lakh noise barriers have been installed on both sides of the viaduct to reduce noise.

Mumbai-Ahmedabad Bullet Train project

The Mumbai-Ahmedabad bullet train project is a faster mode of transport for passengers between the two cities. There are 12 stations planned for the project, which includes nine in Gujarat and three in Maharashtra. The Mumbai station is the only undergrounded station in this project while the rest are in elevated mode. The list includes Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati.

https://static.news9live.com/wp-content/uploads/2025/05/Bullet-train-videos-1.mp4

 

 

The journey of the train from the boarding point to the final destination is expected to be around three hours rather than the regular six to eight hours through passenger trains.

You Might Also Like

‘Proud and poetic moment of justice’: BJP leader on CJI Sanjiv Khanna’s appointment

Uttarakhand Panchayat polls see 70% turnout in second phase; ghost villages lit up with voter’s enthusiasm

Raksha ka Bandhan

‘Amendments being planned’: Centre on repeated hoax bomb threats on flights

How investment, private consumption are driving the Indian economy: What IMF said

TAGGED:Bullet train progressBullet train viaductFastest train IndiaFSLM (Full Span Launching Method)High-speed railHigh-speed rail constructionIndia bullet train projectIndian RailwaysMumbai Ahmedabad travel timeMumbai-Ahmedabad Bullet Train
Share This Article
Facebook Twitter Whatsapp Whatsapp Telegram Copy Link

Latest News

indiapost live
They have history and history of overlooking that as well: Jaishankar on Pak-US ties
India News
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
India News
Education revolution in Punjab: Government schools soar with record results under AAP, says CM Mann
LPG tanker blast in Hoshiarpur kills 2, injures 21; Punjab CM announces aid
India News
Bengal: Teacher thrashed by group of youth for objecting to public drinking
Bengal: Teacher thrashed by group of youth for objecting to public drinking
India News

You also Like

‘Felt like home’: Outgoing US ambassador Garcetti bids emotional farewell to India
India News

‘Felt like home’: Outgoing US ambassador Garcetti bids emotional farewell to India

NM Desk NM Desk 3 Min Read
India is not a dharamshala: Supreme Court tells Sri Lankan national seeking deportation relief
India News

Serving in Operation Sindoor doesn’t give you immunity’: SC refuses exemption from arrest to man convicted for wife’s dowry death

NM Desk NM Desk 3 Min Read
275 dead in Air India plane crash in Ahmedabad: Official tally
India News

275 dead in Air India plane crash in Ahmedabad: Official tally

NM Desk NM Desk 1 Min Read
IndiaPost LiveIndiaPost Live
Follow US
© 2024 NM Media. All Rights Reserved.
  • About Us
  • Privacy Policy
  • Contact Us
Welcome Back!

Sign in to your account