This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Terms of Use.
Accept
IndiaPost LiveIndiaPost LiveIndiaPost Live
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
Notification Show More
Font ResizerAa
IndiaPost LiveIndiaPost Live
Font ResizerAa
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
  • India News
  • State
  • World
  • Entertainment
  • Business
  • Trending
  • Sports
  • Career
  • Lifestyle
  • Languages
Follow US
© 2024 NM Media. All Rights Reserved.

News » India News » Kolkata Metro update: CBTC signalling work commences on East-West Metro line

India News

Kolkata Metro update: CBTC signalling work commences on East-West Metro line

NM Desk
Last updated: 14 January, 2025 3:23 PM
NM Desk
Share
Kolkata Metro update: CBTC signalling work commences on East-West Metro line
Kolkata Metro update: CBTC signalling work commences on East-West Metro line

New Delhi: The Kolkata Metro has taken a major step forward as Communications-Based Train Control (CBTC) signalling work began on Sunday for the entire Howrah Maidan to Sector V stretch of the East-West Metro corridor. This marks a pivotal moment in connecting Howrah and Sealdah, two of Eastern Railway’s busiest stations.

Contents
Benefits for commutersUnified corridor vision

The Bowbazar tunnelling crisis, which had stalled progress for five years, has finally been mitigated. “We have successfully connected Sealdah and Esplanade Metro stations. Electrical works for the aluminium third rail are nearing completion, and we have approached the electrical inspector for statutory EIG inspection,” Financial Express quoted an official as saying.

Kolkata Metro Rail Corporation Ltd. (KMRCL) was granted a complete traffic block on January 12 and another will be granted on January 19, to facilitate the work. A request for full closure of Green Line services from February 8 to March 24 is also under consideration but has yet to be approved.

Read More

Today’s Moonrise in Udaipur: Karwa Chauth moon timing revealed
Today’s Moonrise in Udaipur: Karwa Chauth moon timing revealed
‘Coaching centres are black holes for talent’: V-P warns against cramming, import dependence
‘Coaching centres are black holes for talent’: V-P warns against cramming, import dependence
Maharashtra polls: It’s uncle vs nephew, husband vs wife as family battles play out
Maharashtra polls: It’s uncle vs nephew, husband vs wife as family battles play out

Benefits for commuters

The East-West Metro, also known as the Green Line, promises to improve commuting time. Daily travellers between Howrah and Sealdah, who currently rely on overcrowded buses or taxis, stand to save around 90 minutes.

The Green Line is the first corridor in Metro Railway Kolkata to feature CBTC signalling. The state-of-the-art system enables safe and automatic train operations, including:

Automatic train protection (ATP): Prevents collisions, speeding, and red-light violations.

Automatic train operation (ATO): Allows rakes to communicate real-time data on position, speed, acceleration, and deceleration.

A Metro Railway engineer elaborated, “In normal conditions, the train driver’s primary role is to close doors and press the start button. In emergencies, such as earthquakes, a single command from the control centre can halt all trains simultaneously, similar to systems in Japan.”

The CBTC system allows for a 90-second headway, a feature shared by metros in London and Moscow but not possible with traditional signalling systems like those on the North-South Corridor.

Unified corridor vision

Currently, services on the East-West Corridor are divided into two parts: Green Line-1 (Salt Lake Sector V to Sealdah) and Green Line-2 (Esplanade to Howrah Maidan). With the resolution of the Bowbazar cave-in issue, efforts are now focused on integrating the CBTC signalling system to create a unified corridor.

“This isn’t just about filling gaps like tunnelling or third-rail work. The CBTC integration will ensure seamless connectivity across the entire route,” an official noted. KMRCL has requested a 45-day block to validate and fine-tune the newly installed software. Any adjustments will be sent to overseas laboratories, after which the system will undergo further verification.

You Might Also Like

Six killed, one injured in horrific accident on Dhule-Solapur National Highway in Maharashtra’s Beed

‘No place in Parliament’: Robert Vadra slams Kangana Ranaut’s farmers’ protest remarks

What led to deterioration in Atul and Nikita’s relations, techie’s father explains

Mumbai: 9 people hurt, vehicles damaged after drunk man grabs steering wheel of BEST bus

CID orders probe after Himachal ‘Chief Minister’s Samosa’ go missing

TAGGED:Automatic Train OperationAutomatic Train ProtectionBowbazar TunnelCBTC SignalingEast-West MetroGreen Line Metro KolkataHowrah Sealdah MetroKolkata MetroKolkata Metro Rail CorporationSeamless Metro Connectivity
Share This Article
Facebook Twitter Whatsapp Whatsapp Telegram Copy Link

Latest News

indiapost live
They have history and history of overlooking that as well: Jaishankar on Pak-US ties
India News
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
India News
Education revolution in Punjab: Government schools soar with record results under AAP, says CM Mann
LPG tanker blast in Hoshiarpur kills 2, injures 21; Punjab CM announces aid
India News
Bengal: Teacher thrashed by group of youth for objecting to public drinking
Bengal: Teacher thrashed by group of youth for objecting to public drinking
India News

You also Like

Bollywood star Shah Rukh Khan gets death threat call, Raipur youth arrested
India News

Bollywood star Shah Rukh Khan gets death threat call, Raipur youth arrested

NM Desk NM Desk 3 Min Read
Bengal violence: 2 killed in Waqf-related clashes in Murshidabad
India News

Bengal violence: 2 killed in Waqf-related clashes in Murshidabad

NM Desk NM Desk 1 Min Read
‘Waqf is an Islamic concept, but not Islam’s essential part’: Centre to Supreme Court
India News

SC to hear pleas against EC’s decision to revise electoral rolls in Bihar on Jul 10

NM Desk NM Desk 5 Min Read
IndiaPost LiveIndiaPost Live
Follow US
© 2024 NM Media. All Rights Reserved.
  • About Us
  • Privacy Policy
  • Contact Us
Welcome Back!

Sign in to your account