This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Terms of Use.
Accept
IndiaPost LiveIndiaPost LiveIndiaPost Live
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
Notification Show More
Font ResizerAa
IndiaPost LiveIndiaPost Live
Font ResizerAa
  • Home
  • India
  • World
  • Business
  • Entertainment
  • Sports
  • India News
  • State
  • World
  • Entertainment
  • Business
  • Trending
  • Sports
  • Career
  • Lifestyle
  • Languages
Follow US
© 2024 NM Media. All Rights Reserved.

News » India News » Yamuna Water to Soon Reach Sikar, Churu, and Vice President’s Home District Jhunjhunu

India News

Yamuna Water to Soon Reach Sikar, Churu, and Vice President’s Home District Jhunjhunu

NM Desk
Last updated: 14 May, 2025 12:48 PM
NM Desk
Share
Yamuna Water to Soon Reach Sikar, Churu, and Vice President’s Home District Jhunjhunu
Yamuna Water to Soon Reach Sikar, Churu, and Vice President’s Home District Jhunjhunu

Union Jal Shakti Minister Shri C.R. Patil met with Vice President Shri Jagdeep Dhankhar on Tuesday and discussed the issue of water supply in Rajasthan’s Jhunjhunu, Sikar, and Churu districts. According to sources, the first joint meeting of the task force formed by the Rajasthan and Haryana governments for the implementation of the Yamuna Water Agreement was held on 07-04-2025, and the second joint meeting was conducted on 25-04-2025. A consultant will soon be appointed to prepare the Detailed Project Report (DPR).

It is worth noting that Jhunjhunu is the home district of Vice President Shri Jagdeep Dhankhar, who has consistently worked towards resolving various regional issues, especially those related to agriculture and farmers. Recently, farmers have been protesting at Lal Chowk in Chirawa, demanding Yamuna water. This historic project aims to ensure the drinking water supply particularly to the water-scarce districts of Jhunjhunu, Sikar, and Churu. Given the recent developments, the prospects for the ground-level implementation of the Yamuna Water Agreement have strengthened. Vice President Dhankhar’s persistent efforts for a permanent solution to the region’s water crisis have significantly advanced the realization of this project.

It is important to recall that under an agreement signed in 1994 between Rajasthan, Uttar Pradesh, Haryana, Himachal Pradesh, and Delhi, a total of 11,983 MCM of Yamuna river water was allocated, out of which Rajasthan was allotted 1119 MCM annually.

Read More

Haryana, Jammu & Kashmir assembly election dates revised: Results to be announced on October 8
Four injured in ‘mysterious’ blast at Delhi’s Vasant Kunj
Kedarnath by-poll voter turnout drops compared to assembly elections; polling parties return
Kedarnath by-poll voter turnout drops compared to assembly elections; polling parties return
IAS, IPS, IFS associations to host blood donation camp on June 14 in Patna
IAS, IPS, IFS associations to host blood donation camp on June 14 in Patna

In line with the agreement, the 22nd meeting of the Upper Yamuna River Board (UYRB) was held in 2001 at Hathnikund Barrage (Tajewala Head), where it was decided to allocate 1917 cusecs (equivalent to 577 MCM annually) of water to Rajasthan during the monsoon season (July to October). However, due to the lack of necessary transport infrastructure to bring water from the Hathnikund Barrage, Rajasthan has been unable to receive its share of water since 1994.

In February 2025, a Memorandum of Understanding (MoU) was signed between the governments of Rajasthan, Haryana, and the Ministry of Jal Shakti to meet drinking water and other needs. It was agreed to prepare a joint DPR for transporting water to Rajasthan through an underground pipeline from Hathnikund Barrage.

In this sequence, the first joint meeting of the Haryana and Rajasthan task forces was held on 07-04-2025 in Yamunanagar, Haryana, where initial discussions took place regarding ground-level testing for the pipeline alignment. The second joint meeting of both states’ task forces was held on 25-04-2025 in Palwal.

You Might Also Like

Israeli strikes kill 38 in Gaza’s Khan Younis, 3 journalists in southern Lebanon

India’s youngest body donor: Two-and-a-half-day-old baby donated to Dehradun hospital

Kota student suicides partly due to ‘love affairs’: Rajasthan minister Madan Dilawar

PM Modi cuts short his Saudi visit after Pahalgam terror attack, holds meeting with Doval, Jaishankar at Delhi airport on arrival

Joint Yoga session conducted during India-France exercise SHAKTI-VIII

TAGGED:C.R. PatilChuru water scarcityDetailed Project Report (DPR)Hathnikund BarrageJagdeep DhankharJhunjhunu water projectRajasthan water crisisSikar water shortagewater pipeline projectYamuna Water Agreement
Share This Article
Facebook Twitter Whatsapp Whatsapp Telegram Copy Link

Latest News

indiapost live
They have history and history of overlooking that as well: Jaishankar on Pak-US ties
India News
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
Centre conspiring to stop free ration of 55 lakh Punjabis: CM Bhagwant Mann
India News
Education revolution in Punjab: Government schools soar with record results under AAP, says CM Mann
LPG tanker blast in Hoshiarpur kills 2, injures 21; Punjab CM announces aid
India News
Bengal: Teacher thrashed by group of youth for objecting to public drinking
Bengal: Teacher thrashed by group of youth for objecting to public drinking
India News

You also Like

PM Modi set to hold talks with US President Trump in Washington on Feb 13
India News

PM Modi arrives in France, received by French defence minister

NM Desk NM Desk 2 Min Read
Indore couple missing in Meghalaya: Police reveal how the husband was murdered; wife still missing as probe continues
India News

Indore couple missing in Meghalaya: Police reveal how the husband was murdered; wife still missing as probe continues

NM Desk NM Desk 3 Min Read
TS TET 2024 notification released; registration process to begin on November 5
India News

TS TET 2024 notification released; registration process to begin on November 5

NM Desk NM Desk 3 Min Read
IndiaPost LiveIndiaPost Live
Follow US
© 2024 NM Media. All Rights Reserved.
  • About Us
  • Privacy Policy
  • Contact Us
Welcome Back!

Sign in to your account